PROJECTS

BAIJI GAS TURBINE ( 2 X 159 MW) WITH ODABRECHT COMPANY

Construction unit (3 &4 ) Baiji Gas Turbines (V.94.2) 159 MW each, with Odabrecht Co. 2005-2006.

Complete Construction Of two Unit 159 MW (V.94.2) Gas Turbine For beiji Power Plant, as turnkey job ,Starting From Site preparation , Foundation, Steel Structures, GT, Air Intake, Auxiliary, Balance Of Plant, Piping And Fitting, Water Treatment Unit, Fire Fighting Network , Control. Switch Gear And I&C